Rush production during the writ
Campaign print has no second chance. We produce in our own plant, so the schedule is ours to commit to rather than a supplier's to promise.

The Quebec provincial general election is set for Monday 5 October 2026, and the campaign period is a fixed and short number of days. Everything a campaign prints has to land inside it. That is a different problem from ordinary commercial print, where a week's slip is an inconvenience rather than a lost election.
We own the presses and the cutting, so when we commit to a date we are committing our own capacity rather than relaying a broker's estimate. We would rather tell you on the phone that your date is not achievable than take the order and disappoint you in week two. If we cannot hit it we will say so, and usually we can suggest what to cut to make the date: fewer sizes, one substrate, single-sided on the low-traffic run.
There is a money reason to get the timing right as well as a practical one. Signs erected before the campaign period begins are only partly reimbursable: the cost is divided by the days of use and reimbursed pro rata for the days inside the period. Putting signs up early can therefore cost you real money in your return. Your official agent will know the current treatment, and it is worth a conversation with them before you set the install date.
Frequently asked questions
- When is the Quebec election?
- Polling day is Monday 5 October 2026. The campaign period is fixed and short, which is why signage decisions cannot wait for a second round of design revisions.
- Should we put signs up before the campaign period starts?
- Talk to your official agent first. Signs up before the period are reimbursed only for the days inside it, prorated across total days of use, so an early install can quietly reduce what you get back. It is an accounting question as much as a visibility one.
Related capabilities
Coroplast lawn signs
The workhorse of every campaign: 4 mm corrugated plastic, printed one or two sides, in the volumes a riding actually consumes.
Learn more →Large roadside and property panels
The 4 by 8 and 4 by 4 panels that hold a busy road, on stock rigid enough to stay flat through a Quebec autumn.
Learn more →Stakes, H-frames and volunteer kits
The wire, the zip ties and the count sheets, boxed by team so a volunteer can take a box and go.
Learn more →Start your project
Tell us what you're building. A specialist will reply within one business day with questions, a rough estimate, or samples on the way.